Tiếng Việt
G.E.C
Consultancy
Brochure (PDF Download)
Consultancy projects
Sharing Knowledge Center
Green & Substainable Design
G Energy
Brochure (PDF Download)
Energy Optimization
HVAC Control and BMCS
Sharing Knowledge Center
Green M&E
G Solutions
PMS
HVAC
Water Supply & Waste Water
Support
FAQs
MEP and Fire Knowledges
Automation Knowledges
Control Panels Knowledges
Green & Substainable Design
Cap Saint Jacques Hotel and Condotel in Vung tau City
MEP and Fire Protection Consultancy Services
Viettel Office/Commercial Centre in HCMC
Preparation of Documentation/Criteria for Calling Tender, Tender Analysis/Evaluation
Lotte Center Hanoi Renovation Design
MEP and Fire Renovation Design (1st Floor, Basement 1 & 5 with total GFA 35,500 m2)
Afoco in Myanmar
MEP and Fire Protection Consultancy Services
Energy/Alarm Monitoring System
Design/Engineering,Procurement,Construction (EPC) Contract for TOTO 3 Factory
HVAC Control
Chiller System - Control and Monitoring
Home
»
Support
»
FAQs
Fire
New thread
|
Subscribe to forum
|
FAQ_MEP and Fire
>
Fire
Thread
Created by
Posts
Views
Last post
1
jfwxechk
1
0
jfwxechk
(10/31/2017 10:18:04 AM)
1
pbhurfee
1
0
pbhurfee
(10/31/2017 10:17:42 AM)
Fire Control Room for Buildings in Vietanm
CuTi
3
0
Test
(9/11/2016 12:58:47 PM)
1